merchmix

Creating a Lean Supply Chain: Reducing Waste and Maximising Efficiency

Publish Date :

A lean retail supply chain reduces work and stock movement that do not improve the customer outcome. For Merchmix users, the useful starting point is a repeated planning or stock-handling decision, not a general promise to run the whole business with less inventory.

Identify the repeated decision that creates waste

A buy made against an outdated forecast, an allocation sent to the wrong store and a supplier change copied between files create different types of waste. Map the decision, the record used and the person responsible before changing the process.

Removing a step is useful only when its control is preserved. Approval, quantity reconciliation and receipt checks are not waste simply because they take time.

Worked example: units can move more than once

A retailer sends 100 units to a store. After reviewing demand, 40 return to the distribution centre and the same 40 are sent to another store. That creates 180 unit-movements: 100 outward, 40 back and 40 outward again.

Allocating 60 to the first store and 40 to the second would create 100 unit-movements under the simplified assumptions. The 80-movement difference is handling activity, not 80 extra units of stock or a confirmed dollar saving. Transport routes, packaging and labour determine the actual cost.

Use the plan before moving the stock

Core brings sales, stock and intake assumptions into MFP/WSSI. Core Plus supports allocations and transfers by store and size. Compare the proposed distribution with demand and available supply before releasing it.

Holding some stock centrally may preserve flexibility, but it also changes store availability and handling requirements. The right policy depends on the category and replenishment constraints, not on a universal rule to minimise stock.

Track the outcome of the process change

Atlas supports reporting views that can be configured around the movement and trading records available. Compare repeat handling, availability and stock productivity using a consistent period and scope.

Keep one accountable next action per exception. A shorter spreadsheet process is not an improvement if it conceals an unconfirmed order or leaves nobody responsible for the stock decision.

Continue the decision

Common questions

Does lean retail mean holding as little stock as possible?

No. It means reducing avoidable waste while protecting the required service outcome.

Are the 80 avoided movements a financial saving?

They are a difference in handling activity. Costs must be established separately.

Should approval steps be removed to speed the process?

Preserve necessary controls. Simplify duplicate hand-offs rather than remove accountability.

CONTINUE THE RETAIL DECISION

Need a term explained? Read the retail planning glossary.

Review the workflow with your own team