merchmix

Publish Date :

Planners Should Approve Decisions, Not Build Spreadsheets

In the worked week, a planner spends 26 of 40 hours pulling reports, rebuilding trackers and chasing updates from other systems, leaving 14 hours for the judgement the role is actually for. When the first draft of each reorder, stop and rebalance already arrives with its evidence attached, that split moves to 9 hours of building and 31 of deciding across the same working week.

A merchandise planner reviewing a ready-made reorder draft instead of rebuilding a spreadsheet.
Editorial illustration of the retail planning decision.

THE MERCHMIX DECISION / Yukti + Core

The same 40 hours, split differently

A planner's week does not need more hours. It needs less of it spent rebuilding the same evidence, so more of it goes to the decision the role is actually for.

Independent retail planning example. The weekly hour split is an illustrative assumption, not a measured customer result.

merchmix.Core / Yukti / planner's week
The week, beforeCurrent assumptions

Planner's 40-hour week / building versus deciding

The week, beforeDecision comparison
Building hours26 of 4065% of the week
Deciding hours14 of 4035% of the week
Total week40 hours
Building
26 of 40 hrs
Deciding
14 of 40 hrs
Building takes 26 of 40 hours
SplitHoursShare
Building2665%
Deciding1435%
Most of the week goes before the decision is even reached

This is the assumed starting split for this illustration, not a measured average.

Building takes 26 of 40 hours

Pulling, rebuilding and chasing updates dominate the week.

THE KEY IDEA

A planner's week does not need more hours. It needs less of it spent rebuilding the same evidence, so more of it goes to the decision the role is actually for.

Most of a planner's week is construction work

A planner's calendar rarely shows 'build a spreadsheet' as a task. It shows trade meetings, reorder reviews and store checks. The spreadsheet rebuilding happens underneath those, as the preparation every one of them quietly depends on.

That preparation is not wasted effort; a decision needs a correct, current basis. The issue is how much of the week it consumes relative to the decision itself, and how often the same preparation is redone from scratch because last week's version is already out of date.

Product evidence and planning referencesMerchmix Core: product scope

What 'building' actually includes

Building covers pulling a stock or sales extract from another system, reconciling it against last week's tracker, fixing a formula that broke when a row was inserted, and chasing a colleague for a number that should already be in the report.

None of this is a decision. It is the work that has to happen before a decision can be made responsibly, and it is the part most exposed to version drift, broken links and the time of whoever happens to own the spreadsheet that week.

A worked week, before

In the example, a planner's 40-hour week splits into pulling and reconciling reports (10 hours), rebuilding trackers and formulas (8 hours), chasing updates from other systems or colleagues (8 hours), and reviewing and deciding on reorders, stops and rebalances (14 hours).

Building accounts for 26 of the 40 hours, 65% of the week. Deciding, the part that uses the planner's judgement about demand, suppliers and stores, gets the remaining 14 hours, 35%.

THE FIGURES BEHIND THE DECISION

A planner's 40-hour week before and after, showing hours shifting from building reports to reviewing and deciding.
ActivityBeforeAfter
Pulling and reconciling reports10 hours2 hours
Rebuilding trackers and formulas8 hours3 hours
Chasing updates8 hours4 hours
Reviewing and deciding14 hours31 hours

26 of 40 hours spent building before, versus 9 of 40 after; the freed 17 hours move to reviewing and deciding.

What changes when the first draft arrives ready to approve

Core and Yukti can assemble the stock, sales and intake position and draft the proposed reorders, stops and rebalances with their evidence already attached, so the planner's week starts from a reviewable draft rather than a blank extract.

This does not remove the planner's role in the decision. It removes the repeated reconstruction that happens before the decision, the part of the week that was never really a judgement call in the first place.

THE PLANNING REFERENCERead the inventory-intelligence guide

A worked week, after

In the same 40-hour week, pulling and reconciling reports falls to 2 hours (spot-checking the draft against source data), rebuilding trackers falls to 3 hours (exceptions the standard view does not cover), and chasing updates falls to 4 hours. Building totals 9 hours, 22.5% of the week.

Reviewing and deciding rises to 31 hours, 77.5% of the week. The total working week has not changed; what the planner spends it on has.

Approving still takes judgement, just not reconstruction

More hours spent deciding does not mean faster or looser approval. A planner reviewing 31 hours of proposals a week still checks the demand assumption, the supplier relationship and the store context behind each one, the same way they would for a hand-built recommendation.

What changes is that the hour spent on a reorder goes entirely to that judgement, instead of being split between rebuilding the evidence and then judging it.

SignalMerchmix workspaceDecision to review
26 of 40 hours spent pulling, rebuilding and chasingCore / planner weekIdentify which building tasks a ready-made draft can remove.
Deciding time rises from 14 to 31 hoursYukti / proposal reviewConfirm the extra review time is spent on judgement, not rubber-stamping.
9 hours still go to building after the shiftPlannerSpot-check the draft and resolve exceptions the standard view does not cover.

What this does not claim

This is an illustrative before-and-after split for one planner's week, not a measured result from a customer deployment or a promise that every planner's time divides this way. The categories and hours are independent assumptions chosen to show the kind of shift involved.

It also does not claim the 31 decision hours are easier or less demanding than the original 14; they cover more proposals because less of the week is spent reconstructing the evidence behind each one.

BEFORE THE NEXT DECISION

  • Planner

    Confirm the draft's demand and stock basis before treating review time as decision time.

  • Planning lead

    Track whether freed building hours are actually spent reviewing proposals, not absorbed elsewhere.

  • Decision owner

    Treat the 65%/35% and 22.5%/77.5% splits as illustrative, and measure the team's own week before relying on them.

Common questions

Does this mean planners work fewer hours?

No. The example keeps the same 40-hour week and shows the split between building and deciding changing, not the total.

Why does decision time go up instead of down?

Because building time falls sharply, from 26 to 9 hours, and the freed time moves to reviewing and deciding, which rises from 14 to 31 hours.

Is the 65%/35% split a typical planner's week?

No. It is this illustrative example's assumption, chosen to show the kind of shift, not a measured industry figure.

Does a ready-made draft remove the planner's judgement?

No. Each proposal still needs review against demand, supplier and store context before it is approved, adjusted or declined.

What still takes 9 hours in the 'after' week?

Spot-checking the draft against source data, handling exceptions the standard view does not cover, and chasing updates the draft could not resolve on its own.

yukti

Confirm the extra review time is spent on judgement, not rubber-stamping.

Explore
core

Identify which building tasks a ready-made draft can remove.

Explore

Continue reading: Why planners won't give up Excel (and don't have to)

Read the retail planning glossary

FROM THE ARTICLE TO YOUR OWN RETAIL PLAN

Review the decision.
See the workflow.

Bring your planning questions to a demo, or explore a proof of concept on your own data.

Book a demo Explore the proof of concept