Critical path & projects

One missed date moves all the others.

Design sign-off, fabric approval, sample, fit, costing, PO, production, shipping, each resting on the last. The Critical Path View shows which slip costs the drop.

Merchmix critical path project management

Slips surface a fortnight late.

The tracker is a spreadsheet updated on Fridays. Fabric approval misses, sample and fit follow, and the PO is behind before anyone writes it down.

A mid-market retailer runs 10+ systems and 50+ spreadsheets before merchmix.

Stages pass their delays forward.

Eight milestones, first sign-off to ship date, each with a dependency and a duration.

  1. 01

    Design sign-off

  2. 02

    Fabric approval

  3. 03

    Sample

  4. 04

    Fit

  5. 05

    Costing

  6. 06

    PO

  7. 07

    Production

  8. 08

    Shipping

FORGE · DEVELOPMENT CALENDAR

Ridgeline Rain Jacket · Moss

C10438 · Harbor Tex · SS27 · 8 milestones from 4 Jan
On plan
Ship date
18 Apr
as planned
Critical activities
6
no slack left
Slack remaining
6 days
across the plan
Moved by the slip
0
of 8 milestones
MilestoneDatesState
Design sign-off4 Jan14 Jan2d slack
Fabric approval16 Jan28 JanCritical
Sample28 Jan11 FebCritical
Fit11 Feb19 FebCritical
Costing19 Feb25 Feb4d slack
PO1 Mar6 MarCritical
Production6 Mar31 MarCritical
Shipping31 Mar18 AprCritical
4 Jan18 Jan1 Feb15 Feb1 Mar15 Mar29 Mar12 Apr
Every activity follows the one before it · slack is the only thing absorbing a slip

Lateness shows while it is still small.

The Critical Path View carries a miss forward and marks where the slack ends. Refresh, and the path recomputes.

  1. 01

    Fabric approval misses its date.

  2. 02

    Sample and fit move with it.

  3. 03

    Costing's slack absorbs part of it.

  4. 04

    The PO turns critical: no slack left.

  5. 05

    You refresh; the ship date shows at risk.

5 entries make a path.

Milestones, dependencies, durations, a review of earliest and latest, then the refresh.

  1. Create milestones for samples, approvals and delivery.

  2. Add dependencies and expected durations.

  3. Review earliest, latest and slack.

  4. Identify critical or at-risk activities.

  5. Refresh as dates change.

FORGE · SAMPLE DETAIL

SMP-0412 · Ridgeline Rain Jacket · Moss

C10438 · Harbor Tex · SS27 · fit round 2 · size M
Amend and resubmit
Requested
Mon 11 Jan
Received
Fri 29 Jan
Fit review
Wed 3 Feb
Decision
Fri 5 Feb
Point of measureSpecToleranceMeasuredVarianceStatus
Chest width58.0±1.058.4+0.4Within
Back length74.0±1.074.6+0.6Within
Sleeve length63.5±0.864.9+1.4Out
Shoulder46.0±0.546.2+0.2Within
Hem sweep62.0±1.561.1−0.9Within
4 of 5 points within tolerance · sleeve length over by 0.6 cmMeasurements in cm

Milestone templates and named owners per milestone: UNCONFIRMED.

yukti stays out of the calendar.

Milestones and slips are yours to decide. The one adjacent action is the purchase order, which the agent raises once the date is fixed.

forge keeps the dates, beacon the deliveries.

Sample requests and approvals put milestones on the calendar; the PO reaches the supplier portal; the style lives on the product record.

Questions, answered.

What happens when a date moves?

Refresh; dependencies carry the change forward and the view shows what is now critical or at risk.

Where do the milestones come from?

Sample requests, approvals and delivery, in the Development Calendar with dependencies and durations.

Is this a general project tool?

No. It is the dated sequence a product moves through to make its drop.

How long until our calendar is in it?