merchmix

Publish Date :

New Products With No History: Where the First Forecast Comes From

A new product needs a defined customer role and a reasoned first forecast. Forge supports the research, design and material context behind that product; Core holds the range and financial assumptions, while Core Plus supports the later stock response. Use relevant trading evidence and explicit judgement, then review the forecast as the new style starts selling.

A young buyer comparing a new cream overshirt with a blue reference product and forecast notes.
Editorial illustration of the retail planning decision.

THE MERCHMIX DECISION / Core + Core Plus + Forge

Borrow evidence. Do not borrow certainty.

Separate the analogue, judgement, opening supply and early actuals.

Independent worked retail example. Quantities are planning assumptions, with financial amounts shown in US dollars. Proposed changes remain subject to review.

merchmix.Forge + Core / first forecast
Define the comparisonCurrent assumptions

Use product context to qualify the reference, then test an explicit demand assumption.

Forge › Planning & design › Research

Research workspace

New cotton overshirt · first-forecast evidence

Concept review
WorkbenchSaved evidenceCollection brief
Research objectiveWhich reference supports the Chalk overshirt’s first demand assumption?Compare product use, material, price context and launch exposure.
Reference / Indigo overshirtCustomer role to compare

Reference product and comparable trading window require review.

New concept / Chalk overshirtCotton · six-store launch

Design direction and material choice describe the proposed product, not its future sales.

Forge research and design context informs the planner’s comparison. The example does not assume automatic demand prediction or a completed transfer into Core.

Core / planning assumptionsReference to first forecast
Reference sold1608 stores · 2 weeks
Reference rate10per store / week
Six-store baseline120two-week units
Explicit planning judgement120 × 0.9 × 0.8 = 86.4

Price-response and seasonal factors are assumptions, not measured effects. An explicit ninety-unit forecast rounds the adjusted estimate upward; Forge does not establish these factors.

Different planning records90 forecast / 150 opening supply

The opening quantity can include presentation and retained-cover needs. Product or design approval does not establish demand, available funding or a received allocation.

Evidence and assumptions under review

Forge’s research, design and materials records support the product comparison. Sales evidence, forecast judgement and stock authority each need their own accepted basis.

Connect the brief to the reference

Forge research and material context explain comparability; the reference trading rate is ten per store per week.

THE KEY IDEA

Separate the analogue, judgement, opening supply and early actuals.

Define the product before borrowing another product’s demand

Forge’s Research workspace keeps reference evidence and design observations alongside the collection brief. Design boards organise the proposed direction, while material records provide context such as composition and weight. Those details help the planner define what is genuinely comparable; a well-presented concept or approved design is not evidence of future demand.

The worked new concept is a Chalk cotton overshirt, compared with an Indigo reference overshirt. Both are example products, consistent with the cream-and-blue comparison in the article image. Review their customer use, construction, material, price context and launch exposure before applying a trading rate from one to the other.

Forecasting research treats analogy and structured judgement as appropriate when own-product history is absent. The forecast estimates demand; the financial target expresses an ambition. Forge supplies product-development context, while the planner must still choose the trading evidence and explain the first demand assumption.

Planning and product referencesMerchmix Forge: product-development scope Merchmix Core: product scope Merchmix Core Plus: product scope Forecasting: Principles and Practice, judgement and new products

Choose the analogue for explainable reasons

Compare product function, intended customer, material, price, season, store exposure and availability. A reference saved in Forge can explain a design direction without supplying a usable sales history. Obtain the historical quantities from the relevant trading records and confirm their scope; a comparable style that sold out immediately has constrained sales evidence.

Core supports the new range and MFP/WSSI assumptions. The planner’s analogue review is a method, not a claim that Forge automatically finds the right comparable, predicts its demand or transfers an accepted forecast into Core. Record why the product reference and the historical trading scope belong together before scaling the rate.

Scale the reference before applying judgement

The reference style sold 160 units in two weeks across eight stores, or ten units per store per week. Applying that rate to six stores gives a 120-unit two-week starting estimate. The example assumes comparable availability for the reference period.

A 0.9 price-response factor and 0.8 seasonal factor give 86.4 units, rounded to ninety as the explicit initial planning estimate. These factors are judgemental assumptions, not measured elasticities. Keep the unrounded result visible so the owner can explain both the adjustment and the rounding.

THE FIGURES BEHIND THE DECISION

Borrow evidence. Do not borrow certainty. Separate the analogue, judgement, opening supply and early actuals.
StageBasisResult
Reference rate160 ÷ 8 stores ÷ 2 weeks10 / store / week
Six-store starting estimate10 × 6 × 2120 units
Adjusted estimate120 × 0.9 × 0.886.4; rounded to 90
First actual window72 ÷ 6 ÷ 26 / store / week
Next requirement72 + 30 − 7824 units

Initial estimate = 120 × 0.9 × 0.8 = 86.4, rounded to ninety. After 72 sales, held stock is 78; next need = 72 + 30 − 78 = 24.

Separate the first forecast from the opening quantity

An opening quantity can include presentation or retained-cover needs beyond the first two-week forecast. In this example 150 units become usable at launch. That is a supply choice, not evidence that demand is 150, and it must still fit the budget and size plan.

Core keeps quantity and demand assumptions distinguishable, and Core Plus supports the opening allocation and later refill review. Forge’s concept, material or design approval answers a product-development question; it does not approve the buying budget, create a forecast or confirm stock receipt. Each decision needs its own accepted basis and owner.

THE PLANNING REFERENCERead the MFP/WSSI guide

Use early sales to revise the next window

In the worked example, the new product then records 72 sales over two completed weeks across six stores, giving six per store per week. With no other movements, 78 of the opening 150 remain. A next two-week baseline at that rate is 72 units, rather than another ninety copied from launch. These are independent trading assumptions for the worked example, not measured results for a Merchmix customer.

If the chosen closing target is thirty, incremental need is 72 plus thirty minus 78: 24 units. That proposed top-up depends on usable sizes and arrival within the relevant window. The new rate should also be checked for launch effects, exposure and temporary promotion before being extended.

Keep uncertainty visible after the first revision

Two weeks of selling can improve the evidence without establishing a stable pattern. Changes to the proposed material, fit or customer role may also weaken the original analogue. Keep the product definition reviewed in Forge aligned with the style and scope used for planning; reassess the reference when a material product assumption changes.

Core Plus supports demand-curve refill among its configured models. That capability does not make the assumed six-unit rate a guaranteed future outcome. Retain the source period, availability and target so an allocation owner can inspect why the next quantity changed.

A next-window sensitivity can make the uncertainty actionable. Four units per store per week would imply 48 sales across six stores and two weeks, while eight would imply 96. With 78 held and a thirty-unit closing target, the slower case needs no extra stock and the faster case needs 48. The 24-unit baseline proposal sits between these assumptions.

SignalMerchmix workspaceDecision to review
A new concept has no own sales historyForge + Core / evidence and planningDefine the product context and qualify a separate historical trading reference.
The first actual window completesCore / MFP/WSSISeparate predicted, bought and sold quantities.
A top-up is consideredCore Plus / demand responseCheck size availability, arrival and the revised rate.

Give the first forecast an expiry date

The first estimate is useful when it helps the business place a controlled opening quantity and learn promptly. Set its review point before a repeat becomes too late to help. Preserve the original forecast for hindsight rather than overwrite it with the first actual result.

For the worked overshirt, the sequence is a Forge-informed product comparison, a ninety-unit initial forecast, 150-unit opening supply, 72 example sales and a 24-unit proposed next requirement. Keep these as distinct product, planning and trading records. No automatic Forge-to-Core hand-off, supplier commitment or stock movement is assumed.

Record the forecast error on a comparable exposure basis after each review. A launch forecast should not be judged as wrong solely because fewer stores opened on time or stock arrived late. Separate an assumption about customer demand from an operational constraint that prevented the forecast opportunity from being offered.

BEFORE THE NEXT DECISION

  • Planner

    Record the analogue and judgemental factors.

  • Product and buying owner

    Confirm the brief, product readiness and opening-stock decision without treating them as demand evidence.

  • Allocation owner

    Refresh the next need from usable current supply.

Common questions

Does Forge create the first demand forecast?

Forge supports the research, design and material context for a product comparison. The planner uses trading evidence and explicit assumptions in Core; this workflow does not claim automatic demand prediction.

Are 0.9 and 0.8 measured effects?

No. They are illustrative assumptions requiring evidence and review.

Why does opening supply exceed the forecast?

Opening stock can serve presentation and later cover as well as the first demand window.

Why is the next requirement 24?

Next demand 72 plus target thirty less 78 held equals 24 units.

Does this prove demand will stay at six per store?

No. Availability, launch effects and a longer evidence window still need review.

core

Separate predicted, bought and sold quantities.

Explore
core plus

Check size availability, arrival and the revised rate.

Explore
forge

Define the product context and qualify a separate historical trading reference.

Explore

Continue reading: Historical sales limitations

Read the retail planning glossary

FROM THE ARTICLE TO YOUR OWN RETAIL PLAN

Review the decision.
See the workflow.

Bring your planning questions to a demo, or explore a proof of concept on your own data.

Book a demo Explore the proof of concept