merchmix

Publish Date :

Why Sending Everything to Stores Up Front Backfires

An initial allocation can remove the flexibility the next trading weeks need. Merchmix Core Plus supports the first store quantities and later replenishment against the same stock basis. Compare local opening depth with a usable central reserve before releasing the entire buy.

A young distribution planner reviewing separate store-release cartons and central-reserve stock.
Editorial illustration of the retail planning decision.

THE MERCHMIX DECISION / Core Plus

The first drop should leave room to respond.

Compare opening depth and a usable reserve before fixing every unit’s location.

Independent worked retail example. Quantities are planning assumptions, with financial amounts shown in US dollars. Proposed changes remain subject to review.

merchmix.Core Plus / Allocation
Compare full releaseCurrent assumptions

Compare the first store release with stock retained at the distribution centre.

Allocation › Opening release comparison

Allocation workspace

Everyday crew knit · Stone · S / M / L

Under review
Total stock600 units
Store allocation proposal600 units
Held at DC in comparisonAll assigned
Original buy cost $15,000Unit cost $25Scope Three stores
Allocation comparison
Distribution basisFull opening release
Opening DC holdbackAll assigned

Store size quantities below are opening allocation proposals, before trading.

StoreSMLTotalCover / weeks
Store A30 expected units / week751507530010
Store B20 expected units / week4590451809
Store C10 expected units / week30603012012
Comparison reconciliation600 assigned to stores / no central reserve

Both opening comparisons retain the same $15,000 purchase cost. Holding stock centrally does not release cash.

Allocation comparison only

Size splits and product details are newly created planning assumptions. This screen reconstruction does not represent a saved allocation, released order or actual store receipt.

Compare full-release cover

The first scenario holds nine to twelve weeks locally.

THE KEY IDEA

Compare opening depth and a usable reserve before fixing every unit’s location.

The first drop should serve a window, not empty a warehouse

Sending every unit to stores can feel like progress because goods reach the selling floor. It also commits the location of stock before demand has tested the opening assumption. A slower store can then hold stock the faster branch needs, with another movement required to correct the decision.

Core Plus’s allocation workspace brings the shared stock pool, store quantities and stock held at the distribution centre into the review. Its DC holdback and store-by-size context help the owner inspect the proposed release. Decide what the first drop must support and when another usable receipt can respond; a visible reserve is not automatically available in every required size.

Planning and product referencesMerchmix Core Plus: product scope Allocation reference: holdback quantity

Compare the local cover behind the first release

The worked Everyday crew knit range owns 600 units for three stores. Assumed weekly demand is thirty, twenty and ten units. A full initial release of 300, 180 and 120 creates ten, nine and twelve weeks of local cover before any sales occur.

Those quantities are not wrong solely because they are large. Lead times, presentation needs and capacity matter. The concern is whether the business needs that much stock fixed in each location before learning more, especially when those quantities leave no central units for a later response.

Retain a reserve with an explicit first-review point

A phased alternative releases 120, ninety and sixty units, a 270-unit opening drop, while holding 330 centrally. Local cover becomes four, 4.5 and six weeks. The same 600 units remain owned; the distribution and timing of release change.

After two weeks at the assumed rates, store balances are sixty, fifty and forty. A proposed top-up of sixty, thirty and ten would leave stores with 120, eighty and fifty, and the central reserve with 230. Total owned stock is then 480 after 120 completed sales.

THE FIGURES BEHIND THE DECISION

The first drop should leave room to respond. Compare opening depth and a usable reserve before fixing every unit’s location.
StoreFull-release unitsPhased openingAfter two weeksProposed top-up
A3001206060
B180905030
C120604010

Phased opening 270 + central reserve 330 = 600. After 120 sales and a proposed hundred-unit top-up, stores hold 250 and central reserve 230: total 480.

Do not treat the reserve as free stock for every request

The 330 central units are shared supply, not an allowance each store can claim independently. Review competing needs, sizes and existing movements before deciding the proposed hundred-unit top-up. If the right size is unavailable, an aggregate reserve total cannot fulfil it.

Core Plus supports refill models, minimums, maximums and store overrides. Confirm the configured policy and source position before release. The example uses a reviewable top-up; it does not assume the warehouse automatically follows this quantity or that every transfer can arrive instantly.

The central 330 units equal 5.5 weeks at the combined sixty-unit weekly rate, but that network ratio does not describe any store’s usable cover. A reserve concentrated in the wrong sizes or held behind a slow receiving process can be less responsive than its aggregate figure suggests. Review the response path as well as the percentage held.

The animation adds an illustrative S/M/L source split of 150/300/150. The phased opening leaves 83/164/83 centrally, totalling 330. Its later hundred-unit proposal uses 24/52/24 across those sizes, leaving 59/112/59, or 230 centrally. These are worked size quantities, not a recommended curve or evidence of actual store demand.

THE PLANNING REFERENCERead the allocation and replenishment guide

Check capacity and handling alongside cover

A full release may fit the quantity plan and still exceed a store’s practical capacity. A phased release can reduce local exposure while increasing handling frequency. Compare those consequences using the actual route, staffing and physical constraints rather than declare one method universally cheaper.

The worked example does not calculate transport or handling expense. At a common $25 unit cost, the original 600 units cost $15,000 regardless of their first location. Retaining stock centrally does not reduce that purchase cost or create a cash saving by itself.

Let the first trading period change the next release

Use the next review to compare actual selling with the original assumptions. A faster rate may justify earlier suitable stock; a slower rate may justify retaining more centrally. Recalculate from the current balance so the original allocation and an open top-up are not counted twice.

Core Plus gives the allocation owner a consistent operational context for the response. A proposal is separate from an authorised movement and a receipt. Keep transit and usable arrival visible so the reserve supports the customer before the shortage rather than merely improving a projected cover figure.

Set the next review before the shortest local cover reaches the effective replenishment lead time. Include the time needed to inspect the proposal, pick, move and receive it. The opening allocation must support that complete response interval, not only the vehicle’s travel time.

SignalMerchmix workspaceDecision to review
The first drop uses all supplyCore Plus / allocationCompare the local horizon with a credible reserve.
Stores trade differentlyCore Plus / replenishmentReview current balances and usable sizes before top-up.
A movement is proposedCore Plus / stock responseConfirm source, capacity and arrival before approval.

Approve flexibility that can actually be used

The phased opening in this comparison is 270 units with 330 held centrally, not a universal 55% holdback recommendation. Its suitability depends on the demand horizon, sizes and replenishment response. The later hundred-unit proposal remains under review.

The useful first allocation leaves each store enough relevant stock and the network a credible way to respond. Merchmix Core Plus connects those choices so the retailer can review the next release on evidence instead of treating a cleared distribution centre as proof of a completed allocation strategy.

BEFORE THE NEXT DECISION

  • Allocation owner

    Define the opening review window.

  • Warehouse owner

    Confirm usable reserve sizes and response time.

  • Trading owner

    Use actual selling to shape the next release.

Common questions

Is a 55% central reserve always correct?

No. It is the result of one opening scenario, not a recommended universal holdback.

Does central stock cost less?

Not in this comparison. All 600 units cost $15,000 wherever they are held.

What remains after two weeks?

The business owns 480 units after 120 assumed sales.

Is the hundred-unit top-up executed?

No. It remains a proposed sixty/thirty/ten split awaiting the applicable review.

Why check sizes in the reserve?

An aggregate quantity does not prove that the sizes each store needs are available.

core plus

Compare the local horizon with a credible reserve.

Explore

Continue reading: New-market first allocations

Read the retail planning glossary

FROM THE ARTICLE TO YOUR OWN RETAIL PLAN

Review the decision.
See the workflow.

Bring your planning questions to a demo, or explore a proof of concept on your own data.

Book a demo Explore the proof of concept