merchmix

Educational guide

How do you manage samples and tech packs without spreadsheets?

Most mid-market fashion brands run development on a tracker spreadsheet, a folder of tech pack PDFs and an inbox full of supplier replies. It works until the range grows. Then nobody is sure which tech pack is current, where the sample is, or whether the fit comments reached the factory. This guide covers what a sample and tech pack process needs, where spreadsheets break, and how to move it onto one record.

5 min read · Updated 23 October 2026

The tracker is not the record.

A spreadsheet tracker copies information from everywhere else. The style sits in one tab, the tech pack in a PDF on a shared drive, the fit comments in an email thread and the cost in another workbook. Each copy is right on the day it is made. A week later, at least one of them is out of date, and nobody knows which.

The fix is not a better tracker. It is one record per style that everything else reads from.

A tech pack is a set of frozen decisions.

A tech pack tells the supplier exactly what to make. It holds:

  • construction details
  • how to measure
  • a size specification graded across the run
  • the bill of materials
  • packaging and labelling
  • sewing instructions
  • technical flats

The supplier should only ever work from one signed-off revision. When a measurement or a trim changes, that is a new revision, signed off again, not an edit to last week's PDF.

Samples run on dates.

Most styles go through several sample rounds: a proto to check the idea, fit samples to check the pattern, a size set to check the grading, and a pre-production sample to check the bulk materials and make. Each round has a supplier, a due date, an owner and a status. Each one ends in comments that change the spec.

When a sample is late, the dates after it move too. A tracker shows the late sample. It rarely shows what it does to the delivery date.

One style, from spec to sign-off.

Take a rain shell, CR-014, in the Coastline SS27 range. The base size is M, and it runs XS to XL. The supplier is Harbor Tex.

The size specification sets each point of measure at M, with a tolerance, and grades it across the run: body length, chest width, sleeve length, hem width, hood opening. Fit is checked at the smallest, base and largest size, so the first fit round asks for XS, M and XL against the same frozen spec.

M comes back right and is approved. XS and XL are still to come. Revision 03 is signed off and locked, and the supplier works from revision 03. If the hood opening changes after the next fit, that becomes revision 04, signed off again, and the old PDF stops being the one anyone works from.

Six things to fix first.

  1. One record per style: design, colourways, BOM, specification, tech pack and samples together.
  2. Revisions frozen at sign-off, with who signed and when.
  3. The tech pack exported from the record, never edited as a PDF.
  4. Sample requests logged against the style, with round, supplier, due date and status.
  5. Fit rounds recorded against the frozen specification, at the smallest, base and largest size.
  6. Milestones on a critical path, so a late sample shows up while there is still time to act.

A spreadsheet can store it. It cannot control it.

A spreadsheet can hold every one of those fields. What it cannot do is stop two people editing the same measurement, lock a revision once it is signed, tie a fit comment to the point of measure it changes, or tell you that a late fit sample now puts the delivery date at risk. That control is what a PLM adds.

Move one season, not the archive.

Start with the next season's new styles. Leave carryover and in-flight styles where they are until they finish.

  1. Load the style list, suppliers and size ranges for the new season.
  2. Set the sample rounds and milestones you already use.
  3. Build each new style's tech pack on the record from the first revision.
  4. Give suppliers one place to see the current revision and respond.
  5. Retire the tracker for that season once every style is on the record.

In merchmix, the style is the record.

forge keeps design, materials, colourways, BOM, samples, suppliers, specs and the tech pack on one record, from concept to sign-off. BOM revisions freeze once signed off. The tech pack exports as one PDF for the supplier, from the frozen revision. 3D CAD with materials and markups goes out for review, and virtual fit places the pattern pieces and flags what won't assemble, before the sample ships. Critical path gives one timeline for sign-off, PO, shipping and trading milestones, with dependencies and risk flags, so late samples show up early. When the style is approved, it becomes the range option in core, so development and planning work from the same product.

What is assortment planning?
Breadth, depth and store clusters. Read the guide
What is size curve optimisation?
A size curve is the split of demand across sizes. Read the guide

See if this fits the way you already work.

Questions, answered.

What is a tech pack?

A tech pack is the document a supplier makes the product from. It covers construction details, how to measure, a size specification graded across the run, the bill of materials, packaging and labelling, sewing instructions and technical flats.

What is the difference between a proto, a fit sample and a pre-production sample?

A proto checks the idea. A fit sample checks the pattern on a body or form, usually at the smallest, base and largest size. A pre-production sample checks the bulk materials and make before production starts.

Can you manage tech packs in Excel?

You can, for a small range. Once several people and suppliers work from the same files, versions drift, and nobody can lock a signed-off revision. That is usually the point to move to a PLM.

Who owns the tech pack?

Usually the product developer or garment technologist. Design, buying and the supplier all contribute, but one person signs off each revision.

How long does it take to move off spreadsheets?

merchmix is live in 12 to 15 weeks, end to end. It starts with a free six-week proof of concept on your own data, no contract.

Signals matter while there is time to act.

Let us show you how merchmix keeps teams trading instead of firefighting.